A new and renewable energy power plant with a capacity of up to 40 MW is being developed, utilizing a combination of solar, biomass, and battery power sources. This project is a 100% emission-free, in support of the government's program to achieve Net Zero Emission (NZE) by 2060.
Telephone: +62 21 7279 2645
Instagram: @karimunpowerplant
Jalan Parit Rampak, Karimun, Kepulauan Riau, Indonesia

A new and renewable energy power plant with a capacity of up to 40 MW is being developed, utilizing a combination of solar, biomass, and battery power sources. This project is a 100% emission-free, in support of the government's program to achieve Net Zero Emission (NZE) by 2060.
Telephone: +62 21 7279 2645
Instagram: @karimunpowerplant
Jalan Parit Rampak, Karimun, Kepulauan Riau, Indonesia